News

Motorized cables reels for three new E-RTGs (electrified rubber-tired gantries) at Appalachian Regional Port operated by Georgia Ports Authority.
30.10.2018

Conductix-Wampfler has been selected to provide motorized cables reels for three new E-RTGs (electrified rubber-tired gantries) at Appalachian Regional Port operated by Georgia Ports Authority.

E-RTG Conversion Project Montreal
18.10.2018

In 2016, Montréal Gateway Terminals (MGT) successfully tested two converted Liebherr “E-RTGs” powered by Conductix-Wampfler’s “Drive-in L” conductor rail system.  As a result they recently ordered 10 new Liebherr E-RTGs, also to be powered with the Drive-in L.

CAP - Cable Auto Plug-In for E-RTGs
16.10.2018

Conductix-Wampfler has officially launched CAP (Cable Auto Plug-In). CAP is a new innovative solution within our full-range of port electrification products. CAP automates the process of unplugging and plugging E-RTGs (Electrified Rubber-Tired Gantry Cranes) powered by motor driven cable reels.

Conductix-Wampfler | SR Express Spring Reels
25.09.2018

Conductix-Wampfler, one of the world's leading manufacturers of systems for energy and data transmission to mobile machinery, has developed a new generation of spring reels – the SR series.

Installation of two new pre-assembled festoon systems 0360 series on a Vale ship loader at Terminal Maritimo Ponta da Madeira (TMPM) in Brazil
25.07.2018

The scope of the project included disassembly of the old system, delivery and installation of the new pre-assembled festoon systems, electrical connection and final commissioning.

Tower swing carousel at Zamperla
19.07.2018

Conductix-Wampfler has equipped the tower ride "Vertical Swing – dancing in the sky" at Zamperla S.p.A with conductor rails, slip ring assemblies, and ProfiDAT®.

Conductix-Wampfler showcases CAP – Cable-Reel Auto-Plug-In solution for E-RTGs at TOC Europe
04.06.2018

At TOC Europe 2018 Conductix-Wampfler presents their new automation solution CAP (Cable-Reel Auto Plug-In) for E-RTGs

Conductix-Wampfler electriefied RTGs at MICT
25.05.2018

18 RTG's equipped with the Drive-In L solution / 6,200 meters of conductor rails for 36 blocks / installation in only eight months with ongoing full operation

Pages